This product is ideal for active dog owners who require a durable and adjustable training leash, perfect for dogs of all sizes.
Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Red)
Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Green)
Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Brown)
Fenrir Slip Leash 1.4m Professional Dog Training Lead To Stop Pulling, Perfect For Walks, Easy To Use, Spring Loaded Stopper, Light Weight And Durable