Site Logo
My Account | Wishlist | Basket
All Categories
Dogs
Training & Behaviour Aids

Training Leads

See More
FENRIR
Training & Behaviour Aids - Training Leads

  1. Home
  2. Dogs
  3. Training & Behaviour Aids
  4. Training Leads
Product Image

Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Green)

£19.99

Product Reviews

Name: Review:

Related Products

Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m

Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m

£19.99

Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Red)

Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Red)

£19.99

Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Brown)

Fenrir - Dog Training Leash - Heavy Duty - Double Ended Carabiner - Long Lead - Non-Slip Lead Waterproof Gear for Large & Small Dogs Puppy - 2.1m (Brown)

£19.99

Fenrir Slip Leash 1.4m Professional Dog Training Lead To Stop Pulling, Perfect For Walks, Easy To Use, Spring Loaded Stopper, Light Weight And Durable

Fenrir Slip Leash 1.4m Professional Dog Training Lead To Stop Pulling, Perfect For Walks, Easy To Use, Spring Loaded Stopper, Light Weight And Durable

£17.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© petStuff.uk 2026